Ossipee Lake Road Bikeway
Freedom, New Hampshire
Client: Town of Freedom, NH
Services
- Bid Document Preparation
- Permitting
- Preliminary & Final Designs
- Public Outreach/Participation Coordination
Project Summary
Services
- Bid Document Preparation
- Permitting
- Preliminary & Final Designs
- Public Outreach/Participation Coordination
Hoyle, Tanner provided preliminary and final design services to prepare plans for the construction of a pedestrian / bike path to encourage the shared use of alternatives to motorized transportation. For a 4.5-mile stretch along Ossipee Lake Road, the proposed work widened the existing roadway and is a portion of the total 21.3-mile project that will eventually surround Lake Ossipee. Services were provided to complete the design plans, retain public approval, prepare environmental documentation, and advertise the project for bidding. Improvements proposed new culverts, pavement, minor side slope work, and grading. All along the rural type road summer camps are seasonally populated so the road better accommodates the multi-modal use.