projects

Municipal Parking Garage

Winooski, Vermont

Client: City of Winooski, Vermont

Services

  • Condition Assessment
  • Construction Administration
  • Design
  • Recommendations for Repairs

Project Summary

The City of Winooski contracted Hoyle, Tanner to perform a general structural conditions assessment of their 900 space municipal parking garage. Several repairs and preventative maintenance items were identified including double-tee beam shear tab repairs, expansion joint replacement, foundation wall spall, cracking around floor drains, stormwater penetration locations, and corrosion on a natural gas pipeline. These items were summarized in a structural report with repair recommendations and prioritization.

Hoyle, Tanner provided sketches for repairs to be completed in 2014 by the City’s on-call parking garage Contractor. As a representative for the City, we coordinated directly with the Contractor to ensure quality materials and installation methods were used and provided a review of the finished construction. Based on the quality of the services provided, the City has requested Hoyle, Tanner to continue providing on-call engineering consultation for the municipal parking garage and its annual repair/maintenance program.

Click on thumbnail to view