projects

Airport Master Plan Update and Master Drainage Plan

Ormond Beach Municipal Airport
Ormond Beach, Florida

Client: City of Ormond Beach, Florida

Services

  • Airport Master Planning
  • Aviation Forecasting
  • Drainage Study
  • Facility Assessment
  • Permitting

Project Summary

This project will complete an Airport Master Plan Update (MPU), an FAA Airport Layout Plan (ALP) and a Master Drainage Plan. The MPU and ALP set will consider airport activity demands and facility improvements over the 20-year period from 2014-2034.

The MPU will include a variety of analyses comparing the facilities needed to meet the aviation activity forecasts. Hoyle, Tanner will prepare and evaluate development alternatives for the needed facility improvements including an evaluation of an extension of the approach end of Runway 8 and the justification for the extension. Two alternative conceptual layouts for the development of the Southwest Quad and two alternative conceptual layouts for the development the Northwest Quad will also be presented. A recommended alternative will be identified for the overall facility development plan and presented as a formal Capital Improvement Program.

The Master Drainage Plan will inventory the existing drainage system and model each basin with pond routing software and determine the pre vs. post conditions. Hoyle, Tanner will develop quadrant layouts for the southwest and northwest quadrants on the airport and recommend drainage ponds and outfall locations consistent with the recommended development alternative. The final Master Drainage Plan will meet all requirements of the St. Johns River Water Management District’s Rules and Regulations.

Click on thumbnail to view