home | about us | news & notes | projects & expertise | career opportunities | related links | client data exchange | contact us

Return to Bridges

River Road Bridge Replacement

Gilmanton, New Hampshire

 

River Road is a dead end road with no outlet. Replacement of this bridge required that access be maintained at all times to the residences on the far side.

 

Services Provided

bullet

Bridge design

bullet

Roadway design

bullet

Historic American Engineering Record (HAER) compliant documentation

 

Project Challenges

Some challenges included extensive historic resources research due to the bridge's contribution to the significance of the Gilmanton Iron Works Historic District and determination of the southern boundary of the district. 

The bridge was replaced with a self-contained precast concrete rigid frame.

 

© 2008 Hoyle, Tanner & Associates, Inc.

All Rights Reserved