home | about us | news & notes | projects & expertise | career opportunities | related links | client data exchange | contact us

Return to Bridges

 

NHDOT-I-95 over the B&M Railroad

Portsmouth, New Hampshire

 

 

The plow plates at the expansion joints were being damaged and detached due to the skew of the bridge.

Services Provided:

bullet

Preliminary & Final Design

bullet

Traffic Control Design

bullet

Show Drawing Review

 

Goals:

bullet

Maintain three lanes of traffic Northbound and Southbound

bullet

Construct deck-over-backwall condition to eliminate expansion joints

bullet

Replace the existing bridge rail

 

Unique Features:

bullet

Over 100,000 vehicles per day in summer months, therefore winter construction required.

 

© 2010 Hoyle, Tanner & Associates, Inc.

All Rights Reserved